Keiyu Hospital
Customer’s remarkWe actually practiced efforts for energy conservation by moderate temperature settings, nonuse of air conditioners or lightings when unnecessary, etc. But this time, we have got our energy conservation program into full gear by introducing new facilities. The program is seeking for improvement in environment and energy conservation with cooperation of the service provider. Sales points
Energy conservation effect![]() Comparison between before and after the facility installation
|
Key points in installation work As the installation work was carried out without closing the hospital, utmost attention had to be paid to the safety of both in-patients and out-patients, and thus a meticulous schedule was worked out, according to which the hospital and the contractor carefully conducted the installation work in closer cooperation.
Before installation work
After installation of insulating films |
|||||||||||||||||||||||||||||||||||||||||||||||||||
Facility specifications
| Contract demand | 1,350kW | Air-conditioning facilities | district heating and cooling (DHC) and air conditioner, FCU |
| Stories | 13 stories above ground and 3 below | Refrigerating capacity | DHC (cold water) |
| Total floor area | 35,000m2 | Heating capacity | DHC (steam) |
| Receiving voltage | 20kV | Type of air-conditioning | air conditioner, FCU |
Energy conservation measures
| Automatic control of air-conditioner settings | Settings of air conditioners are automatically adjusted according to load factors. |
| Optimal control of heat source pressures | Pressures of heat sources are adjusted according to load factors. |
| Installation of insulating window films | By cutting the penetrating sun, thermal efficiency of air conditioning is improved. |
| Fan control according to CO concentration in car parking | According to detected CO concentration, power supply for ventilating fans of the basement car parking is controlled, to reduce waste of electricity. |
Fund raising and subsidies
| Fund | : | self-financing |
| Subsidies | : | Project for Promoting the Introduction of High-Efficiency Housing/Building Energy Systems (Project for promoting BEMS introduction) |
Contract type and contract period